A considered approach

Landowners

Leasing land for clean energy projects offers landowners an excellent opportunity to diversify their business and obtain a secure, long-term income stream—typically for 30 to 40 years.

We’ve built strong, open relationships with our partner landowners over many years and are experienced in addressing a wide range of practical concerns—whether that’s impacts on farming or grazing, drainage, fencing, or sporting interests. We are also used to working on forested land and have been selected by both Forestry and Land Scotland and Natural Resources Wales to develop wind farms on their estates.

All development costs and risks are covered by ourselves. We typically begin by entering into an exclusive option agreement over the site while we work to secure planning permission, grid connections, and third-party consents. If successful, we then move to a long-term lease for the construction and operation of the project, during which we make ongoing rental payments for the use of the land.

If you think your land might be suitable for a renewable energy project, please share details via our site appraisal tool, and a member of our development team will be in touch.


notepad-in-field.jpg

Is my land suitable?
Try our site assessment tool to find out

Unlocking the potential

Land Agents

We recognise the valuable role that experienced land agents can play in advising landowners on renewable energy projects.

Over the years, we’ve worked collaboratively with a wide range of land agency firms across the UK and always welcome their involvement. Their understanding of commercial terms and market practice can help ensure that agreements are fair, balanced, and structured to meet the needs of all parties.

To help landowners access independent advice, we cover the cost of professional fees for land agent services, as well as all legal expenses involved in negotiating formal option and lease agreements.


How it works

The project lifecycle explained

Step  
hp-landrover.jpg
compass.svg

Site assessment

Sites are carefully assessed for environmental suitability, wind resource, and grid access. Those that qualify move into development following agreement of commercial terms with landowners.

Development.jpg
paper.svg

Development

We conduct multi-year environmental surveys to design low-impact projects. As plans develop, we engage communities, submit detailed applications, arrange grid connections, and for wind farms, install anemometry masts to confirm wind resource.

Construction.jpg
right-angle.svg

Construction

After planning approval, electricity contracts are secured and construction begins, lasting 12–18 months. Specialist contractors lead the work, using local suppliers where possible. A community liaison group keeps residents informed throughout.

Operational.jpg
wind.svg

Operation

Once built, a project generates clean power for 30–40 years, sold to suppliers or directly to large corporates. With minimal maintenance and 97%+ availability, part of the income supports a fund to benefit the local community.

De commission.jpg
Decomms.svg

Decommissioning

At the end of a project’s life, turbines and equipment are removed, foundations broken down to at least one metre, and the land restored per planning conditions. Alternatively a planning application may be submitted for a new project.

Questions?

We’re glad you asked…

Requirements vary depending on the type of project, but for a wind farm we look for an exposed site of at least 300 acres (120 hectares) (either on its own, or in combination with neighbouring properties), outside of any areas that are nationally designated for landscape (such as National Parks) or ecology (such as SPAs), away from houses and if possible close to grid.

We are a specialist, independent clean energy company - and developing new projects is our whole business.

With many years of experience, we’ve progressed a wide variety of sites, each with its own unique challenges, and built an excellent track record for delivering robust, well-designed projects.

For each new site the company takes on, an experienced development manager is appointed from the outset, and both they, and the wider business, work hard to develop close and open relationships with all landowners involved at all stages of the development process.

Nothing. We will reimburse all third party costs you incur in negotiating commercial terms and legal agreements with us, while also paying option fees for right to take a lease if the project proceeds to construction. In the lease phase we will pay you a rent for the use of your land and also compensate you for the loss of any growing crops or need to repay any pre-existing grants.

Payments are negotiated on a project by project basis and depend on the technology, capacity of the project, its proximity to the grid and the level of energy resource. In all instances however these would almost always be significantly higher than the income streams available from other rural land uses. These would also be index linked for the life of the project to keep pace with inflation

During the development phase for any renewable energy project the great majority of work on site comprises (mainly non-intrusive) surveys and the only physical equipment that might be installed (in the case of a wind farm) is a guyed meteorological mast. There will be little or no impact on existing land uses and all we ask is that landowners don’t do anything that would reduce the prospects of getting planning consent for the project.

During the construction phase there will (for health and safety reasons) be restrictions on the use of different areas of the site at different times. Depending on the technology and size of the project this could last for up to 2 years but, once work is complete, landowners can generally use any land that isn’t built upon, or required for habitat improvement, for other purposes.

Leases typically last for up to 40 years, sufficient to allow for construction, commercial operation, then decommissioning and reinstatement at the end of the project’s life. Shorter lease periods generally aren’t economic as these don’t give sufficient time to recoup the initial capital investment.

For a wind farm it usually takes about 3 years to prepare and submit a planning application. This is because of the need to prepare a detailed Environmental Impact Assessment which in turn requires a wide range of environmental surveys to be carried out - often for a number of years.

Planning applications for wind farms are normally determined in around 2 years, but this can take significantly longer where appeals or public inquiries are needed.

Once planning permission is granted the conditions attaching to this need to be discharged before construction can commence.

Battery energy storage projects have much shorter development periods of perhaps a couple of years but programmes for these projects are usually dictated by grid connection lead times rather than the time required for development.

This would be provided by the local electricity distribution or transmission company (with whom we would negotiate a contract to connect the project to the existing grid as part of the overall development process).

Once generation permanently ceases, all above ground level structures are dismantled and removed from site. Foundations are broken out to a depth of at least 1m below ground and the resulting voids filled with soil and reseeded. Site access tracks are usually left in place for reuse by the landowner while electricity cables are cut off at ground level and made safe.

A bond is also provided to secure these obligations, and landowners can call upon this to cover any decommissioning or reinstatement costs